Rising main
A "rising main" is a vertical pipeline or pipework that carries water or other fluids under pressure upwards from a lower to a higher level. It might be used for:
- Water supply, in multi-story buildings, transporting potable water from a ground-level pump or main supply up to higher floors usually to a water cistern in the roof. This ensures that water pressure is maintained across all levels of the building.
- Pumping wastewater or sewage uphill from a low-lying area to a treatment facility or sewer system. This is particularly useful where gravity-based systems are not feasible due to topography.
- Fire protection, (sometimes called a dry riser or wet riser) where a vertical pipe allows water to be quickly delivered to various floors in case of fire. Dry risers are kept empty but can be charged with water by the fire brigade, while wet risers are kept full of water for immediate use.
Planning Gateway One - Glossary, published on the Planning Portal, defines a rising main/falling main as a: ‘Vertical pipe installed in high buildings for the supply of water for firefighting’
[edit] Related articles on Designing Buildings
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.